MVB

To download this document, please enter your name and email address.
A link to the document will be emailed to your Inbox. Thank You.

Our Client

MVB is a joint venture consisting of three of the UK’s leading civil engineering contractors – Morgan Sindall, VINCI Construction Grands Projets and Bachy Soletanche. They are constructing the four-mile, seven-metre diameter Lee Tunnel on behalf of Thames Water. Watermiser won the contract to supply and install cooling tower systems as part of the project.

Project Details

Watermiser designed, manufactured and installed an appropriate cooling tower, complete with dosing equipment and controls to maintain the drilling operations.